Can't find what you're looking for?

 

Be sure to Sign in to see all available content.

 

If you don't have an account, Register here.

Search results for:

JAPAN-NUCLEAR/
RTR3GEQY 
March 10, 2014 
An employee (C) of Tokyo Electric Power Co. (TEPCO) measures using a dosimeter at the central operating... 
Fukushima, Japan 
An employee measures using a dosimeter at the central operating control room of the No. 1 and No. 2 reactors... 
An employee (C) of Tokyo Electric Power Co. (TEPCO) measures using a dosimeter at the central operating control room of the No. 1 and No. 2 reactors at TEPCO's tsunami-crippled Fukushima Daiichi nuclear power plant at Fukushima prefecture March 10, 2014, a day before the third anniversary of the March 11, 2011 earthquake and tsunami. Members of the media were allowed into the plant on Monday a day before the anniversary of the disaster, which triggered the world's worst nuclear crisis since Chernobyl. REUTERS/Koji Sasahara/Pool (JAPAN - Tags: ANNIVERSARY DISASTER ENVIRONMENT) 
Sort by 
Display 
Items per page 
Page 
of 1