Ajax loader
By using our website, you agree to our use of cookies as described in Cookie Policy.

Can't find what you're looking for?

 

Be sure to Sign in to see all available content.

 

If you don't have an account, Register here.

Search results for: MFO

ISRAEL-EGYPT/SINAI-PEACEKEEPERS
RTS6MIP
November 12, 2015
An armoured Israeli military vehicle drives along Israel's border with Egypt's Sinai peninsula, near...
Nitzana, Israel
File picture of armoured Israeli military vehicle driving along border with Egypt
An armoured Israeli military vehicle drives along Israel's border with Egypt's Sinai peninsula, near the Nitzana crossing in this picture taken January 30, 2014. An Islamist insurgency boiling in the desert peninsula has claimed casualties among the Multinational Force and Observers (MFO), requiring new and often cumbersome precautions. And while participating countries do not say so publicly, there has been some behind-the-scenes debate over the MFO mandate at a period of unprecedentedly close Israeli-Egyptian security cooperation. In northeastern areas of Sinai once strictly demilitarised, Egypt, with Israel's consent, now routinely brings in troops,tanks, fighter jets and helicopters to fight insurgents. REUTERS/Amir Cohen/Files
GEORGIA-RUSSIA/OSSETIA
RTR3FLKD
October 04, 2013
An European Union Monitoring Mission (EUMM) observer uses a pair of binoculars to watch Russian soldiers...
DVANI, Georgia
An EUMM observer uses a pair of binoculars to watch Russian soldiers construct a fence along Georgia's...
An European Union Monitoring Mission (EUMM) observer uses a pair of binoculars to watch Russian soldiers construct a fence along Georgia's de-facto border with its breakaway region of South Ossetia in the village of Dvani, about 120 km northwest of Tbilisi, October 4, 2013. The fence put up by Russian forces on the boundary between Georgia and South Ossetia has been a source of dispute between Russia and Georgia. The breakaway region recognized by Russia as independent had been the focus of a brief 2008 war between the two countries. REUTERS/David Mdzinarishvili (GEORGIA - Tags: POLITICS)
SWITZERLAND/
RTR32ITH
May 23, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles)...
Zurich, Switzerland
A 123-year-old brick building that was moved from its original location is seen at its original location...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles) west from its original location is seen at its original location at the railway station in Zurich Oerlikon May 22, 2012. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32ITE
May 23, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles)...
Zurich, Switzerland
A 123-year-old brick building that was moved from its original location is seen at its final location...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles) west from its original location is seen at its final location at the railway station in Zurich Oerlikon May 23, 2012. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32IT6
May 23, 2012
Workers look at hydraulic pumps as a 6200 tonnes heavy and 123-year-old brick building is being moved...
Zurich, Switzerland
Workers look at hydraulic pumps as a 123-year-old brick building is being moved from its original location...
Workers look at hydraulic pumps as a 6200 tonnes heavy and 123-year-old brick building is being moved 60 m (0.037 miles) west from its original location at the railway station in Zurich Oerlikon May 23, 2012. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32IT1
May 23, 2012
Workers watch hydraulic pumps as a 6200 tonnes heavy and 123-year-old brick building is being moved 60...
Zurich, Switzerland
Workers watch hydraulic pumps as a 123-year-old brick building is being moved from its original location...
Workers watch hydraulic pumps as a 6200 tonnes heavy and 123-year-old brick building is being moved 60 m (0.037 miles) west from its original location at the railway station in Zurich Oerlikon May 23, 2012. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32IST
May 23, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles)...
Zurich, Switzerland
A 123-year-old brick building that was moved from its original location is seen at its final location...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles) west from its original location is seen at its final location at the railway station in Zurich Oerlikon May 23, 2012. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32ISO
May 23, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles)...
Zurich, Switzerland
A 123-year-old brick building that was moved from its original location is seen at its final location...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles) west from its original location is seen at its final location at the railway station in Zurich Oerlikon May 23, 2012. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32ISJ
May 23, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles)...
Zurich, Switzerland
A 123-year-old brick building that was moved from its original location is seen at its final location...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles) west from its original location is seen at its final location at the railway station in Zurich Oerlikon May 23, 2012. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32ISG
May 23, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles)...
Zurich, Switzerland
A 123-year-old brick building that was moved from its original location is seen at its final location...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles) west from its original location is seen at its final location at the railway station in Zurich Oerlikon May 23, 2012. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32IS4
May 23, 2012
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building...
Zurich, Switzerland
A combination of two pictures shows a 123-year-old brick building that was moved from its original location...
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles) west from its original location (top) taken on May 22, 2012 and at its final location (bottom) taken on May 23, 2012 at the railway station in Zurich Oerlikon. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32IRQ
May 23, 2012
A combination of three pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building...
Zurich, Switzerland
A combination of pictures shows a 123-year-old brick building that was moved from its original location...
A combination of three pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles) west from its original location (top) and whilst moving half-way, both taken on May 22, 2012, together with a shot of it at its final location (bottom) taken on May 23, 2012 at the railway station in Zurich Oerlikon. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION)
SWITZERLAND/
RTR32IRB
May 23, 2012
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building...
Zurich, Switzerland
Combination of two pictures shows general view of 6200 tonnes heavy and 123-year-old brick building that...
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles) west from its original location (L) taken on May 22, 2012 and at its final location (R) taken on May 23, 2012 at the railway station in Zurich Oerlikon. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32IQX
May 23, 2012
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building...
Zurich, Switzerland
A combination of two pictures shows a 123-year-old brick building that was moved from its original location...
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 m (0.037 miles) west from its original location (top) taken on May 22, 2012 and at its final location (bottom) taken on May 23, 2012 at the railway station in Zurich Oerlikon. With the translocation of the 80 m (252 ft) long building, it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million ($12.6 million) in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: BUSINESS CONSTRUCTION TRANSPORT)
SWITZERLAND/
RTR32H2V
May 22, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from...
Zurich, Switzerland
General view of 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters from its original...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from its original location is seen on its half-way at the railway station in Zurich Oerlikon May 22, 2012. With the translocation of the 80 meters long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at SwitzerlandÕs seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). The translocation will continue on May 23, 2012. REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION)
SWITZERLAND/
RTR32H2Q
May 22, 2012
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building...
Zurich, Switzerland
Combination of two pictures shows general view of 6200 tonnes heavy and 123-year-old brick building that...
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from its original location (L) and on its half-way (R) at the railway station in Zurich Oerlikon May 22, 2012. With the translocation of the 80 meters long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at SwitzerlandÕs seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). The translocation will continue on May 23, 2012. REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION)
SWITZERLAND/
RTR32H2M
May 22, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from...
Zurich, Switzerland
General view of 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters from its original...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from its original location is seen on its half-way at the railway station in Zurich Oerlikon May 22, 2012. With the translocation of the 80 meters long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at SwitzerlandÕs seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). The translocation will continue on May 23, 2012. REUTERS/Michael Buholzer (SWITZERLAND)
SWITZERLAND/
RTR32H2K
May 22, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from...
Zurich, Switzerland
General view of 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters from its original...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from its original location at the railway station in Zurich Oerlikon May 22, 2012. With the translocation of the 80 meters long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at SwitzerlandÕs seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). The translocation will continue on May 23, 2012. REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION)
SWITZERLAND/
RTR32H2D
May 22, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from...
Zurich, Switzerland
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from its original location at the railway station in Zurich Oerlikon May 22, 2012. With the translocation of the 80 meters long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). The translocation will continue on May 23, 2012. REUTERS/Michael Buholzer (SWITZERLAND)
SWITZERLAND/
RTR32H25
May 22, 2012
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from...
Zurich, Switzerland
General view of 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters from its original...
A general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from its original location is seen on its half-way at the railway station in Zurich Oerlikon May 22, 2012. With the translocation of the 80 meters long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at SwitzerlandÕs seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). The translocation will continue on May 23, 2012. REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION)
SWITZERLAND/
RTR32H1R
May 22, 2012
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building...
Zurich, Switzerland
Combination of two pictures shows general view of 6200 tonnes heavy and 123-year-old brick building that...
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from its original location (top) and on its half-way (bottom) at the railway station in Zurich Oerlikon May 22, 2012. With the translocation of the 80 meters long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). The translocation will continue on May 23, 2012. REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION)
SWITZERLAND/
RTR32H1I
May 22, 2012
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building...
Zurich, Switzerland
Combination of two pictures shows general view of 6200 tonnes heavy and 123-year-old brick building that...
A combination of two pictures shows a general view of a 6200 tonnes heavy and 123-year-old brick building that was moved 60 meters west from its original location (top) and on its half-way (bottom) at the railway station in Zurich Oerlikon May 22, 2012. With the translocation of the 80 meters long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). The translocation will continue on May 23, 2012. REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION TPX IMAGES OF THE DAY)
SWITZERLAND/
RTR32G4W
May 22, 2012
A general view shows a 6,200 tonnes heavy and 123 year-old brick building that is moved 60 metres west...
Zurich, Switzerland
General view shows 6,200 tonnes heavy and 123 year-old brick building that is moved 60 metres from its...
A general view shows a 6,200 tonnes heavy and 123 year-old brick building that is moved 60 metres west from its original location at the railway station in Zurich Oerlikon May 22, 2012. With the relocation of the 80 metres long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION)
SWITZERLAND/
RTR32G4R
May 22, 2012
A general view shows a 6,200 tonnes heavy and 123 year-old brick building that is moved 60 metres west...
Zurich, Switzerland
General view shows 6,200 tonnes heavy and 123 year-old brick building that is moved 60 metres from its...
A general view shows a 6,200 tonnes heavy and 123 year-old brick building that is moved 60 metres west from its original location at the railway station in Zurich Oerlikon May 22, 2012. With the relocation of the 80 metres long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION)
SWITZERLAND/
RTR32G4N
May 22, 2012
Workers prepare in front of a 6,200 tonnes heavy and 123 year-old brick building that is moved 60 metres...
Zurich, Switzerland
Workers prepare in front of a 6,200 tonnes heavy and 123 year-old brick building that is moved 60 metres...
Workers prepare in front of a 6,200 tonnes heavy and 123 year-old brick building that is moved 60 metres west from its original location at the railway station in Zurich Oerlikon May 22, 2012. With the relocation of the 80 metres long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION)
SWITZERLAND/
RTR32G4L
May 22, 2012
A general view shows a 6200 tonnes heavy and 123 year-old brick building that is moved 60 metres west...
Zurich, Switzerland
General view shows 6200 tonnes heavy and 123 year-old brick building that is moved 60 metres from its...
A general view shows a 6200 tonnes heavy and 123 year-old brick building that is moved 60 metres west from its original location at the railway station in Zurich Oerlikon May 22, 2012. With the relocation of the 80 metres long building it paves the way for the Swiss Federal Railways (SBB) to expand its tracks at Switzerland's seventh-largest railway station Zurich Oerlikon. Switzerland's real estate investment company Swiss Prime Site has invested roughly CHF 12 million in order to preserve the former executive office building of the tool and machinery factory Oerlikon (MFO). REUTERS/Michael Buholzer (SWITZERLAND - Tags: TRANSPORT BUSINESS CONSTRUCTION)
EGYPT/
RTXWL91
January 15, 2011
Amr Moussa, Secretary-General of the Arab League, talks during a news conference after meeting with David...
Cairo, Egypt
Moussa, Secretary-General of the Arab League, talks during a news conference after meeting with Satterfield,...
Amr Moussa, Secretary-General of the Arab League, talks during a news conference after meeting with David Satterfield, Director General of the Multinational Force and Observers (MFO) (not pictured), at Arab League headquarters in Cairo, January 15, 2011. REUTERS/Asmaa Waguih (EGYPT - Tags: POLITICS MILITARY)
EGYPT/
RTXWL8Z
January 15, 2011
David Satterfield, Director General of the Multinational Force and Observers (MFO) (L), talks with Amr...
Cairo, Egypt
Satterfield, Director General of MFO, talks with Moussa, Secretary-General of the Arab League, during...
David Satterfield, Director General of the Multinational Force and Observers (MFO) (L), talks with Amr Moussa, Secretary-General of the Arab League, during their meeting at Arab League headquarters in Cairo, January 15, 2011. REUTERS/Asmaa Waguih (EGYPT - Tags: POLITICS MILITARY)
Sort by
Display
Items per page
Page
of 1