Ajax loader

Can't find what you're looking for?

 

Be sure to Sign in to see all available content.

 

If you don't have an account, Register here.

Search results for:

GERMANY/
RTR2CKJO 
April 08, 2010 
Worker at a welding machine prepare a steel cage for the concrete cover of the pipes for the Nord Stream... 
Ruegen, Germany 
Worker at welding machine prepare steel cage of pipes for Nord Stream pipeline at storage facility in... 
Worker at a welding machine prepare a steel cage for the concrete cover of the pipes for the Nord Stream pipeline at a storage facility in Mukran on the Baltic sea island of Ruegen April 8, 2010. Nord Stream will have two pipelines, each with a capacity of 27.5 billion cubic meters a year, on the Baltic Sea floor stretching from Russia?s Vyborg near the Finnish border to Greifswald on Germany?s coast. The 1,220 km-long (758-mile) Nord Stream pipeline will eventually pump 55 billion cubic meters of gas per year to Western Europe, bypassing traditional transit nations. The first pipeline is planned to be completed in 2011. REUTERS/Christian Charisius (GERMANY - Tags: ENERGY) 
Sort by 
Display 
Items per page 
Page 
of 1