Ajax loader
By using our website, you agree to our use of cookies as described in Cookie Policy.

Can't find what you're looking for?

 

Be sure to Sign in to see all available content.

 

If you don't have an account, Register here.

Search results for:

JAPAN-NUCLEAR/
RTR3GEQY
March 10, 2014
An employee (C) of Tokyo Electric Power Co. (TEPCO) measures using a dosimeter at the central operating...
Fukushima, Japan
An employee measures using a dosimeter at the central operating control room of the No. 1 and No. 2 reactors...
An employee (C) of Tokyo Electric Power Co. (TEPCO) measures using a dosimeter at the central operating control room of the No. 1 and No. 2 reactors at TEPCO's tsunami-crippled Fukushima Daiichi nuclear power plant at Fukushima prefecture March 10, 2014, a day before the third anniversary of the March 11, 2011 earthquake and tsunami. Members of the media were allowed into the plant on Monday a day before the anniversary of the disaster, which triggered the world's worst nuclear crisis since Chernobyl. REUTERS/Koji Sasahara/Pool (JAPAN - Tags: ANNIVERSARY DISASTER ENVIRONMENT)
Sort by
Display
Items per page
Page
of 1