Ajax loader
By using our website, you agree to our use of cookies as described in Cookie Policy.

Can't find what you're looking for?

 

Be sure to Sign in to see all available content.

 

If you don't have an account, Register here.

Search results for:

SWISS-TUNNEL/
RTX2F5QG
June 01, 2016
A video grab taken from SDR footage, shows a split screen displaying VIP trains entering the northern...
Gotthard, Switzerland
Video grab shows VIP trains entering northern and southern ends of NEAT Gotthard Base Tunnel simultaneously...
A video grab taken from SDR footage, shows a split screen displaying VIP trains entering the northern end of the tunnel in Erstfield and southern side of the tunnel in Bodio, during the opening ceremony of the NEAT Gotthard Base Tunnel, the world's longest and deepest rail tunnel, Switzerland June 1, 2016. The 57.1-km (35.5 mile)-long Gotthard Base Tunnel, 17 years under construction and designed to last a century, is part of a 23 billion Swiss franc (23.1 billion USD) infrastructure project to speed passengers and cargo by rail below the Alps, as much as 2.3 km (1.7 miles) under the mountain chain, that divides Europe's north and south. REUTERS/SDR/Pool
Sort by
Display
Items per page
Page
of 1