Ajax loader

Can't find what you're looking for?

 

Be sure to Sign in to see all available content.

 

If you don't have an account, Register here.

Search results for:

USA/
RTXXDDR 
February 02, 2011 
A crew from a heavy transportation company makes final preparations for the first of four ConocoPhillips... 
Lewiston, UNITED STATES 
A crew from a heavy transportation company makes final preparations for the first of four ConocoPhillips... 
A crew from a heavy transportation company makes final preparations for the first of four ConocoPhillips megaloads of refinery equipment at the Port of Lewiston in Idaho February 1, 2011. The oversized loads will be transported along scenic U.S. Highway 12 to a ConocoPhillips refinery in Billings, Montana, in a trip that will take three weeks. Each 300-ton coke drum, loaded onto a special transport vehicle, is 29 feet (8.8 metres) wide, 28 feet (8.5 metres) high and 226 feet (68.8 metres) long. REUTERS/Jeff T. Green (UNITED STATES - Tags: TRANSPORT ENERGY BUSINESS) 
Sort by 
Display 
Items per page 
Page 
of 1